MOSCOW, 19-Apr-2017 — /EuropaWire/ — LUKOIL commenced transportation of the topside of a fixed offshore ice-resistant platform (LSP-2), intended for Phase 2 of Vladimir Filanovsky field in the Caspian Sea.
A tugboat caravan will tow the topside, weighing over seven thousand tonnes, towards its destination in the Caspian Sea. The substructures of the platform were brought to the sea and installed in the summer of 2016.
Phase 2 of Vladimir Filanovsky field development provides for the construction of a fixed ice-resistant platform, an accommodation-topside platform and a crossover between the platforms, all being built at Astrakhan’s shipyards.
The launch of the facilities of the second phase of development at V. Filanovsky field is to be completed by the end of 2017.
Information: Vladimir Filanovsky field was put in operation in 2016. According to expert reviews, its recoverable reserves equal 129 million tonnes of oil and 30 billion cubic meters of gas. The designed annual production rate is 6 million tonnes of oil. All the of shore facilities at LUKOIL’s Caspian fields were manufactured at shipyards in Russia.
SOURCE: LUKOIL
Press Centre PJSC “LUKOIL”
Phone:+7 (495) 627-16-77
E-mail:media@lukoil.com
(IN BRIEF) The Lenzing Group announces the Lenzing Young Scientist Award at the Dornbirn Global…
(IN BRIEF) Josée Ouellet, Vice President of Services for Alstom in North America, has been…
(IN BRIEF) Alstom was honored with the 2024 Hydrogen Mobility Award at the 2024 Canadian…
(IN BRIEF) Alstom's Innovation Station in Stockholm has initiated a pioneering two-year collaboration with Tåg…
(IN BRIEF) Alstom's industrial site in Catalonia welcomed Spanish Minister of Transport and Sustainable Mobility,…
(IN BRIEF) Evonik has enhanced its capabilities for RESOMER® powder biomaterials at its Darmstadt site…