![](https://news.europawire.eu/wp-content/uploads/2019/08/MYTILINEOS-subsidiary-METKA-EGN-signs-EPC-and-OM-contract-for-new-solar-plant-in-Chile-144x144.png)
(PRESS RELEASE) ATHENS, 12-Aug-2019 — /EuropaWire/ — METKA EGN signed a contract with Atacama Solar S.A. to undertake the engineering, procurement and construction (EPC) and operation and maintenance (O&M) services for two years of the Atacama Solar II 170,65MWp PV … Read the full press release