
Innsbruck, Austria, 28-9-2015 — /EuropaWire/ — Today (September 26, 2015), at the Tulfes Pfons lot at the Brenner Base Tunnel, in the presence of Mr Günther Platter, President of the Tyrol Region, the ceremony for the start of the excavation works … Read the full press release